Sinsina is one of Saudi Arabia’s reputable and experienced EPCC Companies specialized in Electrical & Instrumentation, Mechanical and Civil Projects. Sinsina has been planning and executing various projects successfully in the Kingdom and is a proud registered contractor of Saudi Aramco, SABIC, MA’ADEN, SWCC and SEC.

Incorporated in 2006, Sinsina has focused on a culture of partnership and synergy with global EPC groups thus blending the strength of engineering, procurement, fabrication, construction, logistics and project management under one window. Recent developments have added specialized maintenance, inspection, plant commissioning, operations and technical training to its already diversified portfolio.
 
 
  NEWS & EVENTS
   
 

ASME

Sinsina has secured ASME ‘U', ‘S', & ‘PP' Code Symbol Stamps from American Society of Mechanical Engineers & ‘R' Code Symbol Stamp from the National Board of Boiler and Pressure Vessel Inspectors.

BULK LIQUID CHEMICAL TERMINAL, JUBAIL COMMERCIAL PORT

Sinsina has been awarded design, engineering, materials supply, fabrication, installation & erection, incl. testing, of ACT Phase 4 project consisting of work portions Phase 4.4 Tankpit E and Phase 4.5 Tankpit G, all such works in the Jubail Commercial Port on 13 March 2016.



EPC Project by MEFSCO

Sinsina has been awarded an EPC Project by MEFSCO (MEFSCO is a joint venture between ARASCO and Cargill) in Al-Kharj, Saudi Arabia consisting the scope of manufacturing of SS Tanks, Pipe Line, E&I & Civil Construction. Value of the awarded contract to Sinsina is SAR. 120 Million.



Sinsina signed the contract for the Construction of Jubail Supply Base at Jubail Commercial Port

Sinsina Corner signed the contract for the Construction of Jubail Supply Base at Jubail Commercial Port. On completion of the project , the proposed Jubail Supply Base will have facilities comprising wharf for vessel berthing, bunker fuel and fresh water tank storage, workshop, warehouse and open storage yard. Sinsina Scope included the construction of 5000 Cubic Mtr Fuel Storage Tanks API STD 650 11th Addition I with Dia of 22.8 Mtr, Height 13.6 Mtr . The total weight of each tank will be 140,000 Kgs. This proposed supply base for integrated logistic services is to be developed on a leased land measuring 3.45 hectares at Jubail Commercial Port for a lease period of 25 years and serves as a one-stop, integrated offshore logistic hub and resource centre for oilfield services, equipment and supplies, supporting the active and growing offshore oil and gas development in the Arabian Gulf

Saudi Electricity Company (SEC) Qurrayah Combined Cycle Power Plant Contract Awarded to Sinsina

Sinsina signed the contract for Saudi Electricity Company (SEC) Qurrayah Combined Cycle Power Plant. The contract is to expand the Al-Qurrayah Combined Cycle Power Plant (Phase C) located in the Eastern Province. The main scope will be to convert the Al-Qurrayah Simple Cycle Power Plant into a Combined Cycle Plant by adding Heat Recovery Steam Generators (HRSGs) to the facility, with capacity of 1,300 MW per year. This will bring the capacity of the plant to a total of 3,800 MW when the project is completed by early 2015. The plant total area is 1.5 million square meters.



Sinsina secures Installation of Reactor & Internals at SATORP

By the Grace of Allah Almighty, Sinsina Corner Company for Contracting has been awarded the installation project at SATORP. SATORP is being developed as an integrated 400,000 barrel/day refining & petrochemical complex as a joint venture of Saudi Aramco & Total group of France. Scope of project involves installation of Process Reactors & Internals. Sinsina is pleased to be associated with this prestigious and important project in Kingdom of Saudi Arabia.



Sinsina moves into New Corporate Building

Sinsina moves into the new Corporate Building in Jubail. The newly constructed five storey building which houses Sinsina on its first floor will have 75 people working to support its operations in the Kingdom. The inauguration of the new building is expected after Ramzan.



Sinsina starts work on the New Camp Facilities

Works kick start on the new camp of Sinsina. The housing camp for use by our own labour, supervisor and engineering staff is located in Jubail the Industrial Hub of Saudi Arabia. The new camping facility is spread over an area of 10,000 Sqm and shall house 500 staff members. The new camp would have separate facilities of Mess, Recreational Centre, Shopping Complex & Mosque for its employees. The work has started on the fast track and inshallah all the labour staff shall be accommodated in the new camp before Ramzan. The camp is expected to be complete in all respects inshallah by September 2011.



SINSINA secures Shop Fabrication of Air Slides

By the Grace of Allah, SINSINA has secured the shop manufacturing of Air Slides for Maáden Raz Az Zour Mineral Complex project. This project marks the entry of SINSINA into Workshop manufacturing business & also makes it a part of one of the biggest development project in the Kingdom.



Rajhi Steel Furnace Installation

By the Grace of Allah, SINSINA CORNER COMPANY FOR CONTRACTING has been awarded the project of Re-Heating Furnace Installation which involves Equipment Installation, Alloy Steel, Stainless Steel & Carbon Steel Piping work at Rajhi Steel Jeddah Plant. This being a fast track project is targeted for completion in 04 months. We wish the project team best of luck for successful completion of the project.



Surveillance Audit of ISO 9001:2015

A surveillance audit was conducted by the external auditors of Moody International against ISO 9001:2015. During the two days of audit, the external auditors check the compliance of the standard at Head Office and Project Sites. The external auditors could not find any minor or major non conformance. Moody International has recommended the company for continuation of certificate against the mentioned standard. Sinsina Corner Company is committed to sustain and improve the health of QHSE by achieving the defined objectives and true implementation of international standard at all our workplaces.



Surveillance Audit of ISO 14001:2015

A surveillance audit was conducted by the external auditors of Moody International against ISO 14001:2015. During the three days of audit, the external auditors check the compliance of the standard at Head Office and Project Sites. The external auditors could not find any minor or major non conformance. Moody International has recommended the company for continuation of certificate against the mentioned standard. Sinsina Corner Company is committed to sustain and improve the health of QHSE by achieving the defined objectives and true implementation of international standard at all our workplaces.



Surveillance Audit of OHSAS 18001:2007

A surveillance audit was conducted by the external auditors of Moody International against OHSAS 18001:2007. During the three days of audit, the external auditors check the compliance of the standard at Head Office and Project Sites. The external auditors could not find any minor or major non conformance. Moody International has recommended the company for continuation of certificate against the mentioned standard. Sinsina Corner Company is committed to sustain and improve the health of QHSE by achieving the defined objectives and true implementation of international standard at all our workplaces.



1.2 Million Manhours at SEC Riyadh Power Plant # 10

SINSINA electromechanical projects team has been recognized for its safe work practises & procedures resulting in 1.2 million manhours without LTI, which emphasises the focus of SINSINA management towards the corporate responsibilities. We congratulate SINSINA QHSE team for their achievement.



New contract won by SINSINA

By the Grace of Allah, SINSINA has been awarded the pumps installation project at SWCC Al-Khobar Plant. This project has been awarded by Torishima Services Solution-JAPAN.The scope of project involves installation of four (04) heavy duty desalinated water pumps, this project marks a milestone in the field of Heavy Lifts, We wish our Jubail Projects Team all the best for the successful completion of the project.



Sinsina Secures Jubail Commercial Port Supply Base Civil Works

By the grace of Almighty Allah, SINSINA has secured the substructure civil works for supply base at Jubail Commercial Port being developed as a 30 year BOOT contract by Dialog Services Saudi Arabia, the targeted completion of the project is 05 months & scope of work includes tank foundations, workshop & warehouse substructure, this project marks another milestone in the continued success story of our Jubail team & wish them best of luck for successful completion.



Works Start For SINSINA Manufacturing Facilities

Committed to provide excellence in engineering, construction works start on Sinsina Manufacturing Facilities. 14,000 Sqm of land located in the heart of Jubail Industrial Facilities would become the first manufacturing facilities for Sinsina Manufacturing Works. The first phase of construction is planned to be completed by end of July. The land is owned by Alsinsina Corner Company for Contracting and would provide manufacturing of engineered goods under licence from the Renowned International Process Companies.



Sinsina Completes Al-Fanar Shut Down

By the Grace of Allah, The plant services team of Sinsina has successfully completed the shutdown of Hail Power Plant, We offer our heartiest congratulations to Mr. Mohammad Naeem & his team for their success as acknowledged by the client.



Sinsina Secures SEC Hail Power Plant Shut Down

By the Grace of Almighty Allah, Sinsina has been awarded Hail Power plant shutdown project. This shutdown is aimed to optimize fuel & services utilization between the existing plant & ongoing 160MW expansion. The Scheduled completion of the project is 15 days. We wish our Plant services team Best of Luck for the successful completion.

 