Replacement of Cooling water radiator skid for GTG Units 1-8. Installation of NOX control system for GTG Units 1-8. Installation of Water Injection system for GTG Units 1-8. Upgradation of speed tronic from Mark V to Mark VI for GTG 1-9. Replacement of compresor and unbucketed turbine rotor assembly of GTG 1-8 except GTG No.3.Extendor parts of GTG No1-8 x GT9(MI). Complete Generator replacement. Replacement of AC/DC power,control & instrumentation signal cables for GTG units 1-8. Replacement of Exhaust plenum for GTG units 1-8. Replacement of shut off and bypass damper geared motor for GTG Units 1-8. Replacement of protection relays by digital type for 13.8/115KV STEP UP. Transformer and 13.8/4.16KV Aux Transformer Units 1,2,3,4,7,8.Replacement of 600V Draw out metal clad switch gear for GTG 1,2,4,7,8.Replacement of Generator breaker of GTG units 1,2,3,4,7,8.Hydrogen control panel for GTG Units 3-8.Replacement of AVR by digital excitation system for GTG Units 1-8.Installation of HVAC ventilation fan and hydrogen detectors inside DCC for GTG Units 1-8 Battery compartment. Motor Control center replacement GTG 1-7. Gas Flow meter replacement and other field instrumentation for GTG units 1-9.installation of 2 Nos GTG secondary unit auxiliary 4.16kV/0.48k dry type transformers GTG 1-8. GTG performance test and training.Training to Marafiq staff.Exhaust frame blowers.Soil investigation for cthodic protection ; Outside Battery Limit
Abener Abeinsa for Construction, Water and power Company
Scope of work
Intercom/Traffic light/microwave pole foundation.Camera pole foundaiton.Lighting pole foundation.Foundation for the barriers and cabinets.swing/sliding gate foundation.foundation for the turnstiles.execution of trenchec,manholes and duct banks,CAT1,CAT3,CAT4 fensing works.Anti-vehicle barrier
Value (SR)
-
Duration
2017 - 2019
Status
Ongoing
Mobilized Manpower
-
0
YOU ARE HERE:
PROJECTSEXECUTED PROJECTSPOWER & ENERGY SECTOR PROJECTS